For the most popular size packages, eligible Canning Vale solar customers (STC Zone 3) receive:
- 3.7 kW of panels: $1,569
- 6.6 kW of panels $2,790
- 10.3 kW of panels: $4,359
- 13.2 kW of panels: $5,579
Based on a nominated number of claimable Small Technology Certificates (2023).
For your convenience, the Perth Solar Warehouse system prices include the subsidy already deducted as a point-of-sale discount (redeemable by Perth Solar Warehouse after installation).
Western Power doesn’t allow single-phase solar inverter capacity greater than 5 kW output. Synergy excludes solar inverter capacities that exceed 5 kW output capacity from the Distributed Energy Buyback Scheme.
Most leading inverter brands state that their inverters can endure solar array oversizing by up to 50%. The Clean Energy Regulator has had its say on this topic and capped the oversizing of solar inverters to 33%.
Therefore, 5 kW Inverter capacity x 1.33 = 6.6 kW of solar panels.
Internal post: Oversizing Solar Arrays on Inverters Increases Savings Potential ›
Yes. Perth Solar Warehouse is a McKercher Corporation electrical business licensed (EC010771) to perform electrical services in Western Australia.
Perth Solar Warehouse uses in-house (not sub-contract) electrical service teams insured and licensed to perform electrical services on your Canning Vale property.
Additionally, manufacturer certified for a secure warranty and CEC Accredited, ensuring industry best practice guidelines.
The average installation wait time varies depending on what you want to be installed. Quite often, this is due to an approval possess with Western Power and Synergy.
As a Guide:
- Inverter replacements: 1 week.
- EV Charger installation: 1 week.
- Solar PV installation: within 2 to 4 weeks (peak 8 weeks).
- Battery installation: within 4 weeks (peak 8 weeks).